Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Xihu District Nanchang renovation _ _ shaped wall repair renovation project cost |
Published: | 2015-07-21 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: a large area in cracks, Lake District renovation project, subways, garages, tunnels, culverts, mine water leakage, all kinds of roof water trap works, toilet leaks, repair project cost, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so waterproof construction tools which hair removal machine, various roller brush row against the drums, paint stirrer, motor vehicle and so on. After the construction operation ⒈ grassroots cleared, should first corner of yin and yang, expansion joints, construction joints and other key parts of the process. Especially scuppers so difficult brushing the site, should be done to strengthen the process, brushing 2-3 times waterproof primer. ⒉ ready waterproofing membrane, waterproof coatings, paint and adhesive base layer coil coating must be distinguish. Primer or paint. In order to improve waterproofing membrane with the primary bonding, the primer can be used repeatedly brushing and brushing uniform, covering completely, to fully penetrate the concrete base, in order to improve the bond strength and shear strength. ⒊ waterproof coating must follow the product instructions ratio, according to A: B = 2: 1 ratio ratio, the amount of mixing in the actual amount of matching each scene. ⒋ waterproof coating Stir the mixture was stirred for about 3 - 5 minutes, and stir until A, B groups were mixed liquid uniform. ⒌ Stir the waterproof coating according to the site area to start brushing brushing, brushing the grass-roots area is greater than the sticky web. Waterproof coating time from the end of agitation until the application is complete no later than 30 minutes is not easy. ⒍ first time after the application is complete primer for about 4-8 hours, before brushing again with the second and third primer, first brushing the thickness of 0.5mm, a thickness of 0.5 second brushing mm left and right, the third brush thickness of about 0.5mm, must rankings after the first coating has completely cured before brushing again a second time before brushing paint. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Waterproof coating building on what is included at the time of the waterproof coating market, the type is still more appropriate, for example, tile roof renovation, cementitious capillary crystalline waterproofing coating type, perhaps an aqueous bitumen coating, epoxy ground floor coatings, and the use of polyurethane waterproof material led to material and so on, they do not belong to the same due to the type of raw materials there are some differences, so sideways in the use of the process, the implementation of standards is also great diversity a. Therefore, the use of the building waterproof coating is not qualified, it is necessary to look at these coatings are not related to the implementation of the standards, only qualified waterproof coating construction division, was adjusted to ensure that the advantages of its function. This is for the construction of the building is necessary for us to remember. Followed by open land resources of the city are occupied by growing cities continue to establish high-rise buildings, three high-level settlement plugging waterproof do to analyze the economy and society. After proper disposition and aspects of the settlement joint seam, reinforced concrete structure layer construction and other construction and flexible layer one by one to talk about. How reasonable settlement plugging waterproof construction? To avoid the various parts of the building settlement joint due to uneven ground settlement resulting in damage to the set straight seam called settlement joint house. Has pouring concrete to form a surface due to a brief presentation and quality of the dangers of doubt, therefore, not the same structural engineering Changzhou settlement joint waterproof plugging disposal requires great care. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Waterproof plugging cause poor quality houses, house husband waterproof plugging; advanced cell water sealing, various underground pipes water trap; hospitals, offices, government agencies, institutions building waterproof plugging. According to Property Condition divided into: the new water seepage, plugging old house, old house trap and other matters. According to plugging into the situation: as waterproof plugging and transformation plus waterproof plugging. For stubborn performance can not be completely disposed of in general we recommend engineered to completely dispose of reasonable doubt. Plugging especially: cracks all kinds of extra facilities and underground construction projects, expansion joints, construction joints waterproof plugging. Since then the vast majority of some water projects engineering surveying, construction plan, construction quality and waterproof plugging the skills of mistakes, waterproof plugging cause poor quality, substandard quality of the project. Some projects in the process of creating it failed, and even can not pass inspection. External surface water, ground water and moist air inside the structure a long time to structure corrosion, roofing renovation, structural resistance lower, has not arrived in engineering structural waterproof needs. Therefore, waterproof plugging engineering quality inspection has become an important method before and after completion of the project. Each mortar concrete works Deformation, construction joints, structural cracks are called "new three seam", "New Three Cracks" is leaking all mortar joints concrete works of the most common drain, disposal methods same foundation, not the same local is carried to the disposal of the seam, the seam hewn wedge, pump plugging conduct; with quick-setting caulking material, assuming little water pressure, seepage quantity is small, can be a one-time block, assumed great water pressure , water rapids arrival, even when the high pressure fluid, the choice of law or pipe smoke tube method. Xihu District Nanchang renovation _ _ shaped wall repair renovation project cost is provided by the Nanchang Shu waterproof Engineering Limited. Xihu District Nanchang renovation _ _ shaped wall repair renovation project cost Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) this year introduced a new upgrade, the above picture is for reference only, please call Tel or pictures on this page, for the latest information, Contact: Manager He. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility