Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Nanchang wall waterproofing, roof waterproofing quote Nanchang, wall waterproofing costs
Information Name: | Nanchang wall waterproofing, roof waterproofing quote Nanchang, wall waterproofing costs |
Published: | 2015-07-13 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap Engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, so waterproof membrane roofing project general approach is: in the original enclosed land closed water experiments with cement mortar surface, after drying (not wet finger), within the walls waterproof, double combined into polyurethane waterproof coating evenly brush three times or made with modified asphalt or fiberglass cloth two oil- cloth handle. Requirements bathroom wall do 1.2-1.5m high, the kitchen is not less than 0.5m high wall waterproofing, balcony facades sill height to prevail. After drying off water storage do 24 hours a closed experiment, after confirming that no leakage ground construction. If the floor or wall of the room destroyed the original, it must be waterproof and closed water closed experiments. 2 conventional method editor building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer, the appearance of a hard tile, according to the traditional method is to pry out the tile, then dug waterproof layer, Nanchang wall waterproofing, re-do The new waterproof layer, re-tiled. Where labor costs, material costs, the amount of time consumed is very large. Latest Method Editor water trap, where the traditional idea is leaking up where. The latest water trap is to abandon the traditional view waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tile well waterproof, waterproof effect is the same. Water trap construction method: a knife to remove the waterproof cement or glue between tile and tile, tumble drying out the ground one day, and then the cement floor of the same color to fill the gully (floor is white, on filled with white cement floor is black, use black cement to fill in, so the room is done to Micron.) and then one kind of qualities CPC waterproofing agent slowly into the cement inside, over a 1-2 day, water repellent and Cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Step underground works underground waterproof projects to be followed when doing the plugging project, plugging leakage when do also need to follow certain principles. Figuratively just need to do before a patient is not sick of various actions to protect themselves, such as cold need more clothes, usually more exercise, then fell ill and needed hospital queue up first payment, the registered specialist out about the disease, the doctor gives the diagnosis and recommendations or a prescription. Similarly, underground waterproof projects also need to follow this step, it should comply with the "anti, row, cut, blocking phase contact, hardness and softness, tailored summarized disposal" criteria. Say this one may be puzzled, following the dismantling of about eleven. "Prevention" means use a variety of methods trek waterproof concrete structure itself was concordant choose other waterproofing methods, so that the project has a certain tone to prevent groundwater entering only. "Row" is to use gravity drainage conditions or mechanical drain away underground drainage method for engineering plugging waterproof create favorable conditions. "Cut" is to address the engineering and provision of drainage to prevent surface water from entering the project fissure. "Blocking" is in the surrounding rock, structure, lined with cracks when water or permeate water, the choice of grouting waterproofing materials and other methods to block the infiltration of water, create favorable conditions for the construction. After the completion of the project has to ensure excellent waterproof function. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap Engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, so waterproof membrane roofing project general approach is: in the original enclosed land closed water experiments with cement mortar surface leveling, after drying (ie not wet), in combination with a double into the polyurethane waterproof coating evenly brush three times or modified asphalt or fiberglass cloth to do two oil-cloth handle. Requirements bathroom wall do 1.2-1.5m high, not less than 0.5m tall kitchen, terrace with exterior walls sill height shall prevail. After drying off water storage do 24 hours a closed experiment, after confirming that no leakage ground construction. If the floor or wall of the room destroyed the original, it must be waterproof and closed water closed experiments. 2 conventional method editor building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer, the appearance of a hard tile, according to the traditional method is to pry out the tile, then dug waterproof layer, re-do a new waterproof layer, re-tiled. Where labor costs, material costs, the amount of time consumed is very large. Latest Method Editor water trap, where the traditional idea is leaking up where. The latest water trap is to abandon the traditional view waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tile well waterproof, waterproof effect is the same. Water trap construction method: a knife to remove the waterproof cement or glue between tile and tile, tumble drying out the ground one day, and then the cement floor of the same color to fill the gully (floor is white, on filled with white cement floor is black, use black cement to fill in, so the room is done to Micron.) and then one kind of qualities CPC waterproofing agent slowly into the cement inside the bathroom wall waterproofing, over a 1-2 day, water repellent and cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. Nanchang wall waterproofing, roof waterproofing quote Nanchang, wall waterproofing financed by Nanchang Shu waterproof Engineering Limited. Nanchang wall waterproofing, roof waterproofing quote Nanchang, Nanchang Shu wall waterproofing cost is waterproof Engineering Company Limited (www.ncsrfs.com) (www.ncsrfs.com) this year introduced a new upgrade, the above picture is only for reference, please call the contact phone book page or image on to obtain the latest information, Contact: Manager He. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility