Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Jiujiang waterproof repair | Nanchang waterproofing Quote | waterproof repair Which low fees
Information Name: | Jiujiang waterproof repair | Nanchang waterproofing Quote | waterproof repair Which low fees |
Published: | 2015-07-07 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap project, how waterproof repair charges, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, roll roofing project so. How to do plugging impact drill with a chisel or the seepage site labeled 4 ~ 5cm deep, 2 ~ 3cm diameter holes for clean after, r-1 type material with water (ash: water = 1: 0.3) stir, shape dough (dough with holes similar size), palm feels heat, quickly plug the hole in the dough, and with palms pressed a few minutes after the palms feel stiff, loosen the palm, and then pressed flat board. 15min after wet curing. Waterproof plugging Plastering Plastering: base surface clean, after fully wet, r-1 type material with water (ash: water = 1: 0.4) Stir (do not contain raw or pellets) into a putty-like, with a trowel or scraper rapid first layer material (thickness 1mm), after hardening spray coating wet cure, then a second layer of material (thickness 1mm), a little harder when feeding the coating dense. If there are local water seepage or wet stains, simply seepage stains or wet coated parts together until no seepage does not wet. And pay attention to overlap, each ingredient is not too much (each time stirring should be exhausted before coagulation), to avoid wastage. After the coating is hardened to be wet curing 3d. Note Note: mixing material used with the distribution, stir well material must be used prior to setting; try to avoid construction under the hot sun, if applied coating solidification in the hot sun, the measures should be added to cover the sun and moisture conservation, below 0 ℃ construction to add antifreeze; the material storage, should be placed in a dry place indoors. After the material bagged stitches, more than expected should be fastened mouth, do not damp. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap project, how waterproof repairs, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project are all waterproof coating General according to the type of coating and paint film formation by main ingredient material classified. ⒈ by waterproof paint types differentiated by the type of liquid coating can be divided into solvent-based, water emulsion and reaction type categories. ⑴ solvent-based coatings in such, as a polymeric film forming materials are dissolved in an organic solvent, into a solution. Polymer Materials molecular state in solution (paint) in. Such coatings have the following characteristics: ① by solvent evaporation, after contacting the molecular chain of the polymer material, lap and other processes and conjunctiva; ② fast drying paint thinner conjunctiva and dense; ③ production process is relatively simple, good storage stability of the coating; ④ flammable, explosive, poisonous, production, storage and use should pay attention to safety; ⑤ solvent evaporation due to environmental pollution when a certain construction. ⑵ water emulsion coating such as a polymer material film forming materials to tiny particles (rather than form molecular state) stably suspended (but not dissolved) in the water, becoming emulsion paint. Such coatings have the following characteristics: ① by evaporation, the solid particles through close contact and deformation process and conjunctiva; ② paint dries slowly, a relatively low deposition of dense solvent-based coatings, generally should not be below 5 ℃ construction ; ③ storage period of not more than six months; ④ can be applied over slightly damp grass; ⑤ non-toxic, non-flammable, production, storage, use safer; simple, do not pollute the environment; ⑥ lower production costs. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Caution Before plugging cracks in basement basement plugging cracks in understanding the precautions, waterproof repair book, First, let's look at the considerations of origin, we see the birth of a variety of considerations, considerations will be different occasions We avoided the use of the process can be a good reminder to prevent any conditions that may occur, Pingxiang waterproof repairs, the first product is very good. During our basement plugging cracks in construction, but also there are a lot of considerations to pay attention to construction workers, we need to fully reflect the details of the professional, plugging cracks in the basement, to customers and create more and better quality works nature is inseparable from the details of the precautions. After construction engineer summary of the actual project, plugging cracks in the basement is the main consideration is: the bottom should pick up clean, according to the underlying condition after monotonous available water wet base surface construction, but the base can not have water. Each coated with the necessary legislation by the amount of construction work, cut not too much or too little. Construction time distance between the layers to dry non-stick coating layer early prevail. Within pastes are usually advised to tune hours after the opening run, showing aggregated data not reuse. Not negative temperature construction, outdoor construction can not be carried out in the rain in. Jiujiang waterproof repair | Nanchang waterproofing Quote | waterproof repair Which low fares offered by the Nanchang Shu waterproof Engineering Limited. Jiujiang waterproof repair | Nanchang waterproofing Quote | waterproof repair costs low Which Nanchang Shu waterproof Engineering Company Limited (www.ncsrfs.com) (www.ncsrfs.com) this year introduced a new upgrade, the above picture is for reference only, please You call Tel picture on this page or to obtain the latest information, Contact: Manager He. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility