Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | How much toilet water, toilet water Ji'an, Nanchang basement plugging company |
Published: | 2015-06-28 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, toilet leaks, make toilet water, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, hotel toilet water, plant water trap works, roll roofing project so. general practice is waterproof: closed water closed in the original experiment with cement mortar surface, after drying (ie not wet), in combination with a double into the polyurethane waterproof coating evenly brush three times or made with asphalt or fiberglass cloth two oil-cloth handle. Requirements bathroom wall do 1.2-1.5m high, not less than 0.5m tall kitchen, terrace with exterior walls sill height shall prevail. After drying off water storage do 24 hours a closed experiment, after confirming that no leakage ground construction. If the floor or wall of the room destroyed the original, it must be waterproof and closed water closed experiments. 2 conventional method editor building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer, the appearance of a hard tile, according to the traditional method is to pry out the tile, then dug waterproof layer, Gian toilet water, re-do a new waterproof layer, re-tiled. Where labor costs, material costs, the amount of time consumed is very large. Latest Method Editor water trap, where the traditional idea is leaking up where. The latest water trap is to abandon the traditional view waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tile well waterproof, waterproof effect is the same. Water trap construction method: a knife to remove the waterproof cement or glue between tile and tile, tumble drying out the ground one day, and then the cement floor of the same color to fill the gully (floor is white, on filled with white cement floor is black, use black cement to fill in, so the room is done to Micron.) and then one kind of qualities CPC waterproofing agent slowly into the cement inside, over a 1-2 day, water repellent and Cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garage, home improvement toilet water, tunnels, culverts, mine leaks, each kind of roof water trap works, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Problems for mine plugging mine in our country was a considerable number of mining mine waterproof plugging requirements was quite high. As we all know our workers during the mining process it is very hard, leakage of water seepage problems due to mine accidents occurred caused is very much. News also reported a few days ago in an area of ??the mine in the mining when there is a problem, leading to several casualties, the accident caused immeasurable loss. We have to analyze the following major mine plugging CAUSED. Through our experience in the construction of numerous mines waterproof plugging, we summarize a number of mine from leakage in water leakage cause analysis, such as in the construction of the mine water walls, water-resistant waterproof gate and strengthen the degree of mine drainage and so many plugging way, although these methods can solve the problem temporarily. But fundamentally, it is a temporary solution, this situation will continue to occur. This also affect and threaten the safety of the mine and construction workers. There is a way of plugging mine is very useful, not only the symptoms but also the root cause, which is to move the water underground water inrush and grouting technology, this approach will produce mine safety lay the foundation, this method will be in the next chapter do highlights. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap Engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, so waterproof membrane roofing project general approach is: in the original enclosed land closed water experiments with cement mortar surface leveling, after drying (ie not wet), in combination with a double into the polyurethane waterproof coating evenly brush three times or modified asphalt or fiberglass cloth to do two oil-cloth handle. Requirements bathroom wall do 1.2-1.5m high, not less than 0.5m tall kitchen, terrace with exterior walls sill height shall prevail. After drying off water storage do 24 hours a closed experiment, after confirming that no leakage ground construction. If the floor or wall of the room destroyed the original, it must be waterproof and closed water closed experiments. 2 conventional method editor building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer, the appearance of a hard tile, according to the traditional method is to pry out the tile, then dug waterproof layer, re-do a new waterproof layer, re-tiled. Where labor costs, material costs, the amount of time consumed is very large. Latest Method Editor water trap, where the traditional idea is leaking up where. The latest water trap is to abandon the traditional view waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tile well waterproof, waterproof effect is the same. Water trap construction method: a knife to remove the waterproof cement or glue between tile and tile, tumble drying out the ground one day, and then the cement floor of the same color to fill the gully (floor is white, on filled with white cement floor is black, use black cement to fill in, so the room is done to Micron.) and then one kind of qualities CPC waterproofing agent slowly into the cement inside, over a 1-2 day, water repellent and Cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. How much toilet water, toilet water Ji'an, Nanchang plugging basement waterproofing by Shu Nanchang Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) strong, credible, Nanchang in Jiangxi Province, the construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu into the brilliant water and you work for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility