Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657
| No.13637657
- Product Categories
- Friendly Links
- home > Supply > Housing repair costs, housing repair Nanchang Which is good, Pingxiang housing repairs
| Information Name: | Housing repair costs, housing repair Nanchang Which is good, Pingxiang housing repairs |
| Published: | 2015-06-26 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garage, house repairs Which low fees, tunnels, culverts, mine leaks, various roofing trap works, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. change epoxy grout material shall meet the following conditions in order to choose a, can be irrigated, and do not shrink after solidification, no dissolution of the material, can be irrigated k = 10-6 ~ 10-8cm / s, the formation of cracks in pourable 0.01mm ; b, strong bond, may be glued joints, wet seam, underwater joints, cracks can be bonded oil, home improvement construction, organic dust and other pollution; c, good mechanical and physical properties, strength, stick knot strength, tensile strength, shear stress and other indicators of high, able to adapt to the construction under dynamic loads (such as high pressure water plugging reinforcement, subway and road track bed reinforcement, building foundation reinforcement, bridge beam for concrete structures and plugging up darn strong etc.); d, the material does not contain dissolved substances, no shrinkage, environmental pollution, corrosion-resistant non-toxic and non-corrosive consolidation body, durability (adhesion), f, until after the sealing material for consolidation, taking From the left side of the crack to the right (or right to left) or bottom-up approach, the chemical pulp with grout pump nozzle at a filling poured from, need to slowly increase pressure grouting when grouting pressure rises to 1 ~ 8mpa, at no added Under the premise of pressure, if grout pump pressure gauge needle does not substantially decline in 2 ~ 3min, to stop the filling spout, move to the next Tsui continued irrigation. In the pouring process, if there filling nozzle through the pulp, the pulp coming through nozzle closed (high pressure hose with wire truss mouth), if there is leakage of slurry seal seam parts, which should stop filling, drain with sealing material blocking the site Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as; a bit: all kinds of large cracks leaking roof, subways, garages, tunnels, culverts, mine water leakage, water trap works, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, roll roofing project so. Step underground works underground waterproof projects to be followed when doing the plugging project, plugging leakage when do also need to follow certain principles. Figuratively just need to do before a patient is not sick of various actions to protect themselves, such as cold need more clothes, usually more exercise, then fell ill and needed hospital queue up first payment, the registered specialist out about the disease, the doctor gives the diagnosis and recommendations or a prescription. Similarly, underground waterproof projects also need to follow this step, it should comply with the "anti, row, cut, blocking phase contact, hardness and softness, tailored summarized disposal" criteria. Say this one may be puzzled, following the dismantling of about eleven. "Prevention" means use a variety of methods trek waterproof concrete structure itself was concordant choose other waterproofing methods, so that the project has a certain tone to prevent groundwater entering only. "Row" is to use gravity drainage conditions or mechanical drain away underground drainage method for engineering plugging waterproof create favorable conditions. "Cut" is to address the engineering and provision of drainage to prevent surface water from entering the project fissure. "Blocking" is in the surrounding rock, structure, lined with cracks when water or permeate water, the choice of grouting waterproofing materials and other methods to block the infiltration of water, create favorable conditions for the construction. After the completion of the project has to ensure excellent waterproof function. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Insulation roofing process when the roof structure layer concrete, preferably with pounding with wiping leveling, when precast structural layer board, housing repair price should be mixed slab filling swell agents C20 fine aggregate concrete then after laying using concrete construction vapor barrier vapor barrier can be used for waterproofing or waterproof coatings. First the reinforced concrete roof rubbed cement mortar, then brushing the cold oil a foundation, wait before making a monotonous two hot asphalt or laying a web Serve felt two oil vapor barrier. Azimuth vapor barrier should be provided on the structural layer under insulation. The selection of the web as a vapor barrier, the choice of full or empty shop law painted shop law, lap to close, the coating layer should be cut off at the left side of the plate dividing joint filling them with sealant, such as the use of asphalt-based waterproofing When the coating, the heat resistance should be higher than the maximum temperature of the indoor or outdoor 20-25 $. Laying vapor barrier needs should be used as a vapor barrier watertight, vapor-tight good waterproof material. May preclude the use of a single-layer waterproofing membrane Stones, should not use vapor-tight due to good quality water emulsion paint thinner; hot asphalt need brushing evenly between the thickness of not brushing across temperature; vapor barrier should be painted to the corner of the wall stand 15cm from the bottom portion; roof flashing at the vapor barrier should be laid along the wall facing continuous, Pingxiang housing repairs, insulation layer above the upper surface of not less than 150mm, to seal the insulation. Construction of the structural layer of roofing cement mortar waterproof cement mortar waterproof layer is generally advised to use in-situ reinforced concrete structure, when the plans panels, and filling them with water closed material. Housing repair costs, Nanchang Which is good housing repairs, home improvement, Ltd. Pingxiang provided by Nanchang Shu waterproofing. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) is an industry leader in Nanchang, Jiangxi, construction, over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum meet customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

