Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Ganzhou water trap, floor water trap, Jiangxi floor waterproof Price (high merchant)
Information Name: | Ganzhou water trap, floor water trap, Jiangxi floor waterproof Price (high merchant) |
Published: | 2015-06-08 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement water sealing, steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project and so has a wealth of experience in construction. water trap of tips 14. High copolymer modified bitumen coating: bitumen-based material, modified with synthetic polymers, formulated as a water emulsion or solvent-based waterproof coatings. 15. Trapping synthetic polymer waterproof coating: synthetic rubber or synthetic resin as the main film-forming substance, formulated as a single component or multi-component waterproof coating. 16. The primary treatment agent: In order to enhance the adhesion between the base layer of waterproof material, in front of the waterproof layer construction, pre-painted coating on the substrate. 17. dividing joint: To reduce cracks in the roof screed, rigid waterproof layer, rigid protective layer leaving in advance of the seam. Rigid protective layer made V-shaped grooves on the surface only, known as surface sub-lattice seam. 18. The water trap empty shop law: Stones waterproofing membrane, with the primary coil only within certain width around the bond, the rest of the construction method is not bonded. 19. The carcass reinforcing materials: refers enhanced waterproof coating layer of synthetic non-woven fabric, the glass fiber mesh cloth and other materials. 20. cold bonding method (cold construction): The cold adhesive or mastic conduct web grassroots, bond and membrane and membrane without the need for construction of heating method. 21. Overhead insulated roofing: sintered products with thin clay or concrete made of waterproof layer covering the roof and set up a certain height space, the use of air flow to improve heat dissipation, heat insulation effect of the roof. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. water trap water trap how to do general practice In home decoration process, the need to make room for water main with bathroom, kitchen, balcony. Waterproof main purpose is to own home when using water, will affect the downstairs neighbor through leakage. So when his home roof leaks or seepage, in his roof waterproofing is useless, must be waterproof will be effective in your neighbor's upstairs floor. I live on the first floor of the user though not waterproof, but water can also play a moisture barrier, moisture barrier and so on. Waterproof general practice is: In the original ground with cement mortar, after drying (ie not wet), in combination with a double into the polyurethane waterproof coating evenly brush three times or modified asphalt or fiberglass cloth to do two oil-cloth processing . Requirements bathroom wall do 1.2-1.5m high, not less than 0.5m tall kitchen, terrace with exterior walls sill height shall prevail. After drying off water storage do 24 hours a closed experiment, after confirming that no leakage ground construction. If the floor or wall of the room destroyed original roof water trap, it must be waterproofed and closed water blocking experiments. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground engineering water trap, water trap garages, tunnels, culverts, mine water leakage, all kinds of roof water trap works, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Elevator shaft construction method of plugging the last chapter we have just finished analyzing the specific reasons for the occurrence of leakage of the elevator shaft, in this chapter we will continue this topic floor water trap, next to you on the elevator shaft plugging construction methods. Construction method of plugging the elevator shaft plugging leaks and other similar methods actually, first of all we start with the traditional method of plugging directly is to cracks or leaks drilling, surface sealing, but the effect is often not up to to the desired effect, often blocked it happened here, where they began to leak. Because water can not rule movement in concrete internal cracks, leaking from a relatively thin parts. Therefore, this method is now close to plugging eliminated, the market has been relatively less used. Currently finally welcomed an elevator shaft plugging construction method is chemical grouting, generally refers to the slurry produced by the chemical material, filling the mouth buried by drilling, the use of pressure writes structural cracks, allowed to relax, freezing, arrived waterproofing, sealing, reinforcement, reinforcement purposes. Commonly used to repair the deep cracks in concrete structures. The pressure and speed of filling can be divided into high and low pressure grouting method to slow rapid grouting method. At that time, in addition to the elevator shaft plugging applied outside the chemical grouting method has been widely used in various basement, bridge waterproofing works. Ganzhou water trap, floor water trap, Jiangxi floor waterproof Price (high merchant) provided by the Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) located at Nanchang Qingshan Lake Avenue and Beijing Jingdong Road interchange of Analysys International (Rainbow Department Store upstairs) Room 911, Building 1. Scraps and development in the wave of market economy, currently Shu water has a high profile in the engineering construction, enjoys a good reputation. Shu waterproof obtain the whole network business alliance certification, marking our service and management level has reached a new height. Shu waterproof staff willing to work with all people of insight and common development, for a better future. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility