Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Honggutan Nanchang water trap, water trap Engineering Nanchang, Nanchang plugging |
Published: | 2015-06-07 |
Validity: | 0 |
Specifications: | Nanchang waterproof plugging |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water projects, water and other projects to repair water trap company Nanchang, such as: large cracks leaking underground garages, tunnels, culverts, mine leaks, each kind of roof water trap works, leaking toilet, water sealing, has a wealth of experience in the construction basement waterproofing plugging, steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. water trap small 24. Common sense synthetic polymer sealing material: synthetic polymer based materials, adding an appropriate amount of chemical additives, fillers and coloring agents, through a particular production and processing of the paste sealing material. 25. The joint displacement: ROOF system, due to temperature, external cause changes in the seam gaps. 26. stretch - compression cycle: the reflection of the sealing material during use, due to temperature changes undergo periodic joint displacement pulled after pressure cycling to maintain the ability to seal. 27. The full bonding method (full bonding method): Stones waterproof material, with the primary coil construction method of all bonding. 28. Article paste method: Stones waterproofing membrane, with the primary coil strip bonded construction method. Each piece of adhesive surface with the primary coil at least two, each width of not less than 151mm. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, toilet leaks, waterproof plugging Nanchang water trap, basement water sealing, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Step underground works underground waterproof projects to be followed when doing the plugging project, plugging leakage when do also need to follow certain principles. Figuratively just need to do before a patient is not sick of various actions to protect themselves, such as cold need more clothes, usually more exercise, then fell ill and needed hospital queue up first payment, the registered specialist out about the disease, the doctor gives the diagnosis and recommendations or a prescription. Similarly, underground waterproof projects also need to follow this step, it should comply with the "anti, row, cut, blocking phase contact, hardness and softness, tailored summarized disposal" criteria. Say this one may be puzzled, following the dismantling of about eleven. "Prevention" means use a variety of methods trek waterproof concrete structure itself was concordant choose other waterproofing methods, so that the project has a certain tone to prevent groundwater entering only. "Row" is to use gravity drainage conditions or mechanical drain away underground drainage method for engineering plugging waterproof create favorable conditions. "Cut" is to address the engineering and provision of drainage to prevent surface water from entering the project fissure. "Blocking" is in the surrounding rock, structure, lined with cracks when water or permeate water, the choice of grouting waterproofing materials and other methods to block the infiltration of water, create favorable conditions for the construction. After the completion of the project has to ensure excellent waterproof function. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water projects, water and other projects to repair water trap get Which Nanchang, such as: large cracks leaking underground garages, tunnels, culverts, mine leaks various roofing trap works, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. water trap The tips we understand the principles of water trap, then we look at the water trap of twenty-eight little common sense, although the content more streamlined, but we can refer to reference, as follows: 1. block rigid waterproof Layers: to penetrate the waterproofing agent waterproof cement mortar to the bottom of the waterproof layer, an intermediate brick paving materials and other fast water trap Nanchang price, then pouring cement mortar waterproof and wipe waterproof surface. 2. The backing material: sealing material embedded control to add depth, to prevent the sealing material and seams bottom bonding, deformable material is set in the middle bottom of the joint and sealing material. 3. impoundment Roof: build a certain height of water on the roof waterproof layer, heat insulation effect of the roof. The planted roof: the casing in the roofing layer or laying sawdust, vermiculite and other loose material, and grow plants, play a role in insulation in the roof. 5. The inverted roof: the hydrophobic insulation material is disposed on the roof waterproof layer. 6. waterproof layer and durable life: that of roofing layer can meet the deadline of normal use. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility