Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Roofing material waterproof material _ _ Nanchang Riverside Great water trap |
Published: | 2015-05-02 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap Engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, so waterproof membrane roofing project general approach is: in the original enclosed land closed water experiments with cement mortar surface leveling, after drying (ie not wet), in combination with a double into the polyurethane waterproof coating evenly brush three times or modified asphalt or fiberglass cloth to do two oil-cloth handle. Requirements bathroom wall do 1.2-1.5m high, not less than 0.5m tall kitchen, terrace with exterior walls sill height shall prevail. After drying off water storage do 24 hours a closed experiment, after confirming that no leakage ground construction. If the floor or wall of the room destroyed the original, it must be waterproof and closed water closed experiments. 2 conventional method editor building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer, the appearance of a hard tile, according to the traditional method is to pry out the tile, then dug waterproof layer, re-do a new waterproof layer, re-tiled. Where labor costs, material costs, the amount of time consumed is very large. Latest Method Editor water trap, where the traditional idea is leaking up where. The latest water trap is to abandon the traditional view waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tile well waterproof, waterproof effect is the same. Water trap construction method: a knife to remove the waterproof glue or cement roofing material between tiles and tiles, tumble drying out the ground one day, and then the cement floor of the same color to fill the gully (floor is white , it is filled with white cement floor is black, use black cement fill, this is done to the room Micron.) and then one kind of qualities CPC waterproofing agent slowly into the cement inside, over a 1-2 day, waterproofing agent and cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Crack Repair detection patched completed crack, with coring drill testing. Test results should be concrete surface is smooth, dense, filled with a slurry of all the cracks, and core samples of concrete compressive strength test, to repair the original design value ⒋ smear smear rugged construction and repair cracks at the process as follows: 1) a thorough cleaning and wetting the surface to be repaired, remove any loose material and excess water. 2) the ratio of paste adhesive layer coating material in the repair area as the base smear. 3) The mixing ratio of the applicator patch material layer, until the desired consistency. As the mixture is too dry Nanchang brand waterproof material, add the wet premix; if the mixture is too thin, then adding the required ratio of dry material, the full uniform mixing. 4) with a rubber scraper bar ruler for cracks and uneven surfaces with applied patches applied than expected. Mixture must be able to repair cracks or weathering inflow area, to find and fill any voids. 5) The ratio of paste adhesive layer coating material applied last patch area, so that the surface leveling, smooth. 6) Carefully place the protection has been repaired, avoid walking, and so on until the flow of water through drying. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, water works, repair water and other projects, such as: large cracks leaking underground garages, tunnels, culverts, mine water leakage, all kinds of roof water trap engineering, leaking toilet, water sealing, basement waterproofing plugging waterproof material, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing project so. Waterproof coating building on what is included at the time of the waterproof coating market, the type is still more appropriate, for example, the type of cementitious capillary crystalline waterproofing coating new waterproof materials, may be water-based bitumen paint, epoxy floor coatings and the use of polyurethane waterproof material led to material, etc., they are not the same because the type belongs raw materials has some differences, therefore, in the process of applying sideways, the implementation of standards also have great differences. Therefore, the use of the building waterproof coating is not qualified, it is necessary to look at these coatings are not related to the implementation of the standards, only qualified waterproof coating construction division, was adjusted to ensure that the advantages of its function. This is for the construction of the building is necessary for us to remember. Followed by open land resources of the city are occupied by growing cities continue to establish high-rise buildings, three high-level settlement plugging waterproof do to analyze the economy and society. After proper disposition and aspects of the settlement joint seam, reinforced concrete structure layer construction and other construction and flexible layer one by one to talk about. How reasonable settlement plugging waterproof construction? To avoid the various parts of the building settlement joint due to uneven ground settlement resulting in damage to the set straight seam called settlement joint house. Has pouring concrete to form a surface due to a brief presentation and quality of the dangers of doubt, therefore, not the same structural engineering Changzhou settlement joint waterproof plugging disposal requires great care. Great roofing material _ _ Nanchang Riverside mending leakage waterproof material provided by the Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) strong, credible, Nanchang in Jiangxi Province, the construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu into the brilliant water and you work for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility