Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Bathroom waterproof material waterproof material _ _ Gan Jiang Hotel Nanchang water trap
Information Name: | Bathroom waterproof material waterproof material _ _ Gan Jiang Hotel Nanchang water trap |
Published: | 2015-04-14 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so waterproof plugging app by China Electronics Business Association 3G development and application engineering certification authority official platform [1]. 6 waterproof coating waterproof coating editing features ⑴ waterproof coating before curing and viscous liquid, therefore, not only in the horizontal plane during the construction, but also in the facade, Yang angle and a variety of complex surface, forming a seamless complete waterproof membrane; ⑵ used without heating, reducing environmental pollution, but also easy to operate and improve working conditions; ⑶ waterproof layer formed little weight, especially for lightweight waterproof roof. ⑷ waterproof membrane forming a greater extensibility, water resistance and weather resistance, can adapt to small changes in the grassroots cracks. ⑸ coated waterproof coating, is both the subject material waterproof layer is adhesive, it is easy to bond quality assurance, maintenance is also relatively simple. Especially for grassroots cracks, construction joints, water bucket and run through some parts likely to cause leakage around the tube, etc., can easily be enhanced brushing, patch and other operations. Must use a brush, scraper and other layer by layer when brushing or scraping ⑹ construction, it is difficult to do the waterproofing membrane thickness as uniform as waterproofing membrane, waterproof membrane susceptible quality construction conditions. Therefore, when you use waterproof paint, should carefully understand the nature and characteristics of the material, the use of the method, the minimum amount per unit area and repeat the coating, the need for scraping, and must be carefully considered each detail enhancement layer of waterproofing. Classification Nanchang Shu waterproof coating waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, each kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects are all waterproof Notes ⒈ Stir the paint before using it. ⒉ the temperature is below 0 ℃ or above 35 ℃ not construction (construction of high temperature should be avoided). ⒊ storage temperature 5 ℃ -35 ℃ appropriate. ⒋ should choose six hours without rain and snow construction. ⒌ paint dry or not before laying waterproofing membrane roofing materials, construction and prevent trampling or other vehicle. ⒍ Construction reference product before use. Plugging material properties A, B, C, D four kinds of polymer chemistry materials after a good pairing for the liquid with a good hydrophilic property, water that is thinner; they are curing agent. Deep penetration, can penetrate the hair slit concrete structures like water before coagulation and pervasive waterproof materials, compounds dispersed after water slurry, and then gel consolidation. Above plugging material has good hydrophilic property, water is both thinner, but also a solid press agent. Deep penetration, can penetrate concrete structure within 0.01mm hair slit, before solidification and water, no tie Nothing Nanchang brand waterproof material, its density is lower than the density of water. Water slurry dispersed compound, and then gel consolidation grouting carried out in wet or gushing cases, adaptability to water quality in the sea water and the PH of 3-13 can gelled colloidal solid elastomer, can water swelling, flexible sealing and above the dual function of water for irrigation, electricity, tunnels, subways, air defense, mines and other construction joints and cracks deformation processing water impermeability plugging, plugging material in any proportion The mixing ratio used can be formulated in different strength, different depth of penetration, and it is a multiple of different materials swell different solidification. After grouting, as long as the deformation Deformation not exceed 2.5mm, may be leaking. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Insulation roofing waterproofing layer when the roof structure is concrete, with the pound should be wiped with leveling when assembling prefabricated structural layer board, filling seams should swell agents doped C20 fine aggregate concrete, then wipe shop Construction of Cement vapor barrier vapor barrier can be used after the waterproofing membrane or waterproof coatings. First in the reinforced concrete roof rubbed cement mortar, then brushing cold oil a foundation, and then let it do the monotonous two hot asphalt or laying a carpet roll and serve two oil vapor barrier. Azimuth vapor barrier should be provided on the structural layer, insulating layer under. The selection of the web as a vapor barrier, the choice of full or empty shop law painted shop law, should be closely overlap, the coating layer should be cut off at the end of the stay plate dividing joint filling them with sealant, such as the use of asphalt-based waterproofing When the coating, the heat should be higher than the highest temperature of the indoor or outdoor 20-25 $. Laying vapor barrier needs to be chosen as the vapor barrier watertight, vapor tightness good waterproof material. May preclude the use of a single-layer waterproofing membrane paving, should not use steam tightness due to good quality water emulsion paint thinner; hot asphalt needs brushing evenly between the thickness of not brushing across temperature; vapor barrier should be brushing to the corner of the wall stand 15cm from the bottom part; roofing pan of water at the vapor barrier should be continuous along the wall facing laying up on the surface of the insulation layer is not less than 150mm new waterproof materials to seal insulation. Construction structural layer of roofing cement mortar waterproof cement mortar waterproof layer is generally better to use the in-situ reinforced concrete structure, when planning for precast panels, and filling them with water closed material. Bathroom waterproof material waterproof material _ _ Gan Jiang Hotel Nanchang Nanchang water trap by Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) strong, credible, in Nanchang, Jiangxi construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu waterproof and you hand into the brilliant, for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility