Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Bathroom waterproof materials | high security waterproof material | Nanchang water trap
Information Name: | Bathroom waterproof materials | high security waterproof material | Nanchang water trap |
Published: | 2015-04-13 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects are all waterproof construction tools which hair removal machine all kinds of brush roll row against the drums, paint stirrer, motor vehicle and so on. After construction operations ⒈ grassroots cleared, should first corner of yin and yang, expansion joints, construction joints and other key parts of the processing. Especially scuppers and other difficult parts of brushing should be done to strengthen the deal, brushing 2-3 times waterproof primer. ⒉ ready waterproofing membrane, waterproof coatings, primary coil coatings and adhesive coatings must distinguish. Brushing primer. To improve waterproofing membrane and primary adhesion, available primer repeatedly brushing, and brush evenly, covering completely and fully penetrate the concrete base to improve the bond strength and shear strength. ⒊ waterproof coating must follow the product instructions ratio, according to A: B = 2: 1 ratio ratio, stirring amount matching the actual amount of each scene. ⒋ waterproof coating should stir, stir for about 3 - 5 minutes, and stir until A, B groups were mixed liquid homogeneous. ⒌ Stir the waterproof coating according to the area of ??the site you want to start brushing brushing, brushing the grass-roots area is greater than the sticky web. Waterproof coating time from the end of agitation until the application is complete no later than 30 minutes is not easy. After ⒍ primer first application is complete about 4-8 hours, before brushing again the second and third primer, the first brushing thickness 0.5mm, a thickness of 0.5 second brushing mm or so, the third brush thickness of about 0.5mm, must rankings after the first completely solidified before brushing paint brush again before the second paint. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, waterproof plugging Nanchang brand waterproof material, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. How do block drain with a chisel or percussion drill sites will be labeled seepage 4 ~ 5cm deep, 2 ~ 3cm diameter holes for clean after, r-1 type material with water (ash: water = 1: 0.3) stir, shape into material group (group size and holes similar material), palm feeling fever new waterproof materials, dough quickly plug in the hole, and with the palm suppress a few minutes, after the palm feels stiff, loosen the palm of your hand, and then flatten planks. 15min after wet curing. Waterproof plugging Plastering Plastering: base surface clean, after fully wet, r-1 type material with water (ash: water = 1: 0.4) Stir (not including raw material or aggregate) into a putty-like, with a trowel or squeegee rapid first layer material (thickness 1mm), after hardening water wet curing coating, and then a second layer of material (thickness 1mm), when feeding a little hard coating dense. If there is a local seepage or wet stains, simply seepage stains or wet coat parts together until no seepage does not wet. And pay attention to lap, each ingredient is not too much (each stir before condensation should run), to avoid wastage. After the coating is hardened to be wet curing 3d. Note Note: mixing materials used with the distribution, mixing good material must be used prior to setting; try to avoid the sun construction, if construction coating solidified in the hot sun, the sun should be added to cover and wetlands conservation measures, below 0 ℃ construction to add antifreeze; the material storage, should be placed in a dry place indoors. After the material bagged stitches, more than expected should be fastened mouth of roofing material, not wet. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage waterproofing materials, tunnels, culverts, mine leaks, various roofing water trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. cause facades might seep Some reasons for the leakage of households used improperly, the process of renovation hammer hits the wall, causing shock facades hollowing, crack, causing water seepage. Caused due to uneven ground subsidence, hot and cold changes and other reasons, resulting in cracks in the walls appear to varying degrees. This is the phenomenon of the building after a certain time appeared inevitable. Exterior wall frame beams, columns and walls between the cracks. This is due to the construction, the tie bar spacing between columns and walls are not set norms. The gap between the window and the wall. In the course of masonry walls, window frames than the general reserve itself is slightly larger, so when you install a window sash around the gap is bound to have different sizes exist. Exterior wall dividing joint or sub-lattice seam settings wrong, resulting in hollowing, destroyed the surface layer of waterproof paint is not set. Waterproof outer wall member projecting detail improper handling practices. Currently protruding wall facades lines, cantilevered plate member is gradually increasing, in various forms, bring to the construction operation and difficult to waterproof walls and security. The above is the cause of the external walls of water seepage, and we should try to avoid damage to exterior walls, such as the occurrence of seepage water trap company, please find a professional trap. Bathroom waterproof materials | high security waterproof material | Nanchang Nanchang water trap by Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) strong, credible, in Nanchang, Jiangxi construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu waterproof and you hand into the brilliant, for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility