Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Repair of roofing construction company _ _ Shu professional waterproofing waterproofing repair Songhai Development
Repair of roofing construction company _ _ Shu professional waterproofing waterproofing repair Songhai Development
Information Name: | Repair of roofing construction company _ _ Shu professional waterproofing waterproofing repair Songhai Development |
Published: | 2015-04-09 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Cementitious capillary crystalline waterproofing coating construction type construction method: ① data transfer share. Information in accordance with 0.25 to 0.3: 1 water-cement ratio (weight ratio) full deployment into cement-like mixture, during which not a small gray ball; ② pursuant to 1.5kg / m2 (0.8mm thickness) used for brushing construction, brushing things that can be used brush brushing, roller brush, scraper brush, wiping mud clip, spray painting and other measures, as well as dry sprinkle method. Brushing and methods of construction to be divided roller end twice, brushing time distance 2 ~ 3h, brushing back and forth should reverse direction, the other end of the construction methods can once; ③ concrete layout for the appearance of a vague, cracks, cellular To repair such as appearance, especially block to be chiseled mortar drops, should eradicate the base surface of mud, floating blocks, oil and other debris before proceeding with construction, while brushing construction must adhere plenty moist base before brushing, sometimes while brushing side spray, stick wet base surface. ④ The product itself has a moisturizing effect common, usually demand within 6 to 8 hours after construction of water spray, moisturizing waterproof roof repair maintenance contract, 2 to 3 times a day, every other day once again maintenance (maintenance moisturizer can not with water to maintain). Padding: ① construction of the base surface finishing clean and free from dust, clean the base surface not have clear water; ② on paint, how much use mix, mixing good paint should be used within 20 minutes, at higher temperature, the time Also relatively short. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, water service construction program, mine leaks, each kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproofing preservative waterproof maintenance, ground water projects, plant water trap works, roll roofing projects so. The best way to have what a waterproof plugging seepage construction of a surface, plugging construction: ① according to the shape of holes or cracks, the plugging material molded into a slightly smaller size of dough, place for a while (to pinching hard heat appropriate sense) into the water shut-off after the opening and squeeze the stick, smashing it to the surrounding light Compaction can instantly stanch; ② before plugging leaks around the hole should first have seepage or leakage of the site to be the first for water treatment, etc. after a certain strength or has a waterproof capability, and then plugging the water holes, otherwise water may oozing from its surroundings; ③ then at about 10cm around plugging at, and then cast again scraping material. 2, wipes construction: ① be coated hardened (hand pressure without leaving fingerprints) to wet the water trap maintenance contracts, but not in water, and then a second layer of material trowel or squeegee, if partial remains seepage, plus a layer, until no leakage so far; and finally click "plugging construction methods" plugging water; ② If the base surface seepage serious fight diversion holes at the bottom of the first down, and then the top-down construction, with a dry cloth Wipe dry immediately with a trowel first base layer material; ③ Dosage: each: 1-1.5kg / m; plugging construction 1 hole treatment: leaks at the bottom of a large population of small hewn "" groove ; and remove debris tick under debris, watering fully wet; 2, material preparation: press powder: water = 1: 0.25 (weight ratio), the "water does not leak," added to the water and knead into a group; When the material to be slightly ④ Push it back and forth several times more dense, while paying attention to the overlap of roofing repair construction company _ _ Shu professional waterproofing waterproofing service provided by the Songhai Zone Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum meet customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility