Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Professional roofing, roofing projects Shu plant, Castle Lake water |
Published: | 2015-03-31 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Kitchen wall waterproofing treatment to make the kitchen to achieve better water effects waterproof, respond kitchen floors and walls were made waterproof. Kitchen wall waterproofing should reach 0.3 meters height. Base surface treatment: 1. base surface must be strong, smooth, clean roof water trap, no dust, greasy, wax, mold release agents and other substances, and other debris; 2. The base has pores, cracks, inequality defects shall previously patched with cement mortar smooth; 3. Ensure the base fully wet, but no clear water. Details of the deal: 1. Mixing: first liquid material into the container, then slowly add the powder, and stir for 3-5 minutes until a homogeneous slurry and no raw dough particles can be used; (best Using a blender); 2. Brushing: Brushing with a brush or brush directly at the base surface, the intensity of the use of uniform, can not leak brush; normally takes brushing 2 times (according to the use requirements), each brushing The thickness of no more than 1mm; once again a little before and after brushing dry solids were then (just sticky, usually spaced 1-2 hours), front and rear vertical cross brushing, brushing the total thickness is 1-2mm; if Tu layer has been cured, the first wet with water when brushing another; 3. Conservation: 24 hours after construction proposal cover with a damp cloth or spray coating the coating watering conservation. 4. Protection: Take after construction ban completely dried before the stampede, rain, exposure, acute injury protection. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage workshop roofing, tunnels, culverts, mine leaks, various roof water trap works, toilet leaks, waterproof plugging professional roofing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. What grade underground works a waterproof: do not allow water seepage, no wet stains on the surface structure. Two: do not allow leakage, structural surface may have a small amount of wet stains. Industrial and civil buildings: wet stains total area of ??not more than 0.1% of the total water area of ??no more than a single wet stains 0.1㎡ area, 100 square meters of any surface water seepage is not more than 2; other underground projects: wet stains with a total area of ??not more than waterproof 0.2% area, a single wet stains area not more than 0.2 meters, 100 square meters of water in any area not more than 3; The tunnel project also requires no more than an average amount of water seepage 0.05L / (㎡.d), on any area of ??100 square meters waterproof seepage is not more than 0.15L / (㎡.d) three: a small amount of leakage points, not wired sediment flow and leakage, wet stains single area of ??not more than 0.3 m2, the amount of leakage leakage point is no more than a single 2.5L / d, any 100 m2 area of ??not more than 7 waterproof. Four: There is leakage point, not wired sediment flow and leakage. The average amount of leakage of the whole project is not greater than 2L / (㎡.d), any water area of ??100 m2 on average leakage amount of not more than 4L / (㎡.d). Professional roofing, roofing projects Shu plant, provided by the Nanchang Qingshan Lake Shu waterproof waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum meet customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility