Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657
| No.13637657
- Product Categories
- Friendly Links
- home > Supply > Construction roofing projects | Shu ramp roofing projects | Songhai Development waterproof
| Information Name: | Construction roofing projects | Shu ramp roofing projects | Songhai Development waterproof |
| Published: | 2015-03-30 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Stripping off the concrete walls waterproof plugging plugging in the prevention of corrosion waterproof layer, and the presence of anti-corrosion paint brush premature timing waterproof layer construction of cooling towers, concrete strength is too low and humidity is too large concrete surfaces and other factors, These factors resulted in coating and bonding strength of the concrete surface is reduced. Cooling tower inner wall coatings, although in slightly wet cooling tower construction of the base surface, but prematurely applied according to the performance of concrete after stripping, due to wet concrete itself, large water content, its cohesion will be greatly reduced, it is easy to fall off failure. It is understood that the inner wall of the cooling tower is in the concrete mold release coating soon began brushing waterproof plugging operations, synchronized with the rising rate of concrete. When the small layer of concrete pouring rising velocity, high temperatures, the concrete surface is dry fast, and the concrete surface before coating the cooling tower construction have enough time to dry, in which case the cooling tower construction paint, the better, as the lower part of the cooling tower A rising plate roofing solution every 2 to 3 days, then the construction of the cooling tower temperature is higher, the strength of concrete is high, the cooling tower body wall thick, easy concrete cooling tower construction, therefore, the concrete surface of this area Paint largely intact, no shedding, waterproof plugging. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage construction roofing projects, tunnels, culverts, mine leaks, each kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so. Bathroom and kitchen areas of anti-leakage. Leakage reason is not doing waterproof, leakproof approach is: 1, before the renovation to carefully check the upstairs floor of the kitchen, bathroom leaks, and if there is, you should let the upstairs water works well after the renovation. If you do not live in the upstairs temporarily or for other reasons, upstairs temporary waterproofing treatment or not, you should take steps to remedy: brushing polyurethane leakage at the bottom of the site, but the leakage area of ??the plaster layer to be disposed grass-roots should be dry. 2, kitchen, bathroom renovation when, if the original tiles destroyed renovated, regardless of whether they have been the original waterproof layer of roofing quotes, you should redo the waterproof layer before re-stick tiles, surrounded by water-storey side wall 200mm, There are parts of the bathtub, shower waterproof layer should be done to be able to spray all parts. 3, the kitchen, the bathroom is not waterproof when renovation: original without making waterproof layer, in accordance with the method described above plus a waterproof layer; original waterproof layer has been done, it should be carefully checked to see if the waterproof layer is in place, whether the damaged water, otherwise should be repaired. After injection test patches to downstairs and around the walls no leakage, no moisture for eligibility criteria. After the wet part 4, kitchen, bathroom and other water completion of the renovation, the ground level should be less than private room or hallway floor elevation. Kitchen, bathroom doorway should be installed at the stone is not afraid of the water, the roots should be done in water treatment, to prevent water seepage from the doorway of the living room to. 5, bathroom, kitchen aisle spacing threshold special needs attention. Before installing the threshold, are required to be filled with cement mixing until dry and then placed the threshold and door, so you can clean the toilet every day, the kitchen and the interval water effectively blocked effectively reach a waterproof, leakproof role . Construction roofing projects | Shu ramp roofing projects | Songhai Development provided by Nanchang Shu waterproof waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum meet customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

