Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Waterproof toilet maintenance, repair leaking Shu houses, Castle Lake water service |
Published: | 2015-03-17 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Tower wall coating off Cause Analysis and water cooling tower corrosion plugging plugging water, cooling tower wall corrosion chloride - polyvinylidene chloride copolymer emulsion (referred to as chlorine partial emulsion) power plant cooling tower cooling tower cooling tower construction corrosion construction cooling tower body premature loss of wall coating failure is premature destruction of the cooling tower is another factor in the inner wall of the cooling tower used in the anti-corrosion coating is waterproof vinyl chloride - vinylidene chloride copolymer emulsion (referred to as chlorine partial emulsion) water service is A new synthetic polymer emulsion, non-toxic, odorless, non-flammable, can be a little wet in the base surface cooling tower construction, good film-forming properties, conjunctival dense, after the film permeability is greatly reduced. The coating can first two branches tied hi etc: Jingyuan hyperbolic cooling tower power plant severely damaged the cause of concrete analysis of the cooling tower and cooling water to isolate steel waterproof repair, waterproof plugging concrete saturated with water to prevent freezing occurs melt by cooling water damage and melt out of the erosion damage. If the coating is well play a role, I believe that even if the lack of concrete cooling tower frost label also from damage or delay damage. The actual inspection found strong area of ??low concrete cooling tower water plugging in vivo anti-corrosion coating walls almost completely from the skin or loss, premature loss of coating failure, did not meet the impermeable coating should the role of the low frost resistance of concrete Premature exposure to cooling water, water saturation and freeze-thaw damage occurred in freezing and thawing, waterproof plugging. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground waterproofing roof waterproofing maintenance contracts, plant water trap works, roll roofing projects and so on. Bathroom and kitchen areas of anti-leakage. Leakage reason is not doing waterproof, leakproof approach is: 1, before the renovation to carefully check the upstairs floor of the kitchen, bathroom leaks, and if there is, you should let the upstairs water works well after the renovation. If you do not live in the upstairs temporarily or for other reasons, upstairs temporary waterproofing treatment or not, you should take steps to remedy: brushing polyurethane leakage at the bottom of the site, but the leakage area of ??the plaster layer to be disposed grass-roots should be dry. 2, kitchen, bathroom renovation when, if the original tiles destroyed redecorated done regardless of whether the original waterproof layer waterproof layer should be redone before re-stick tiles, waterproof storey side wall around 200mm, with bathtub parts, waterproof layer should be able to do the shower spray to all parts. 3, the kitchen, the bathroom is not waterproof when renovation: original without making waterproof layer, in accordance with the method described above plus a waterproof layer; original waterproof layer has been done, it should be carefully checked to see if the waterproof layer is in place, without damage, or should repair. After injection test patches to downstairs and around the walls no leakage, no moisture for eligibility criteria. After the wet part 4, kitchen, bathroom and other water completion of the renovation, the ground level should be less than private room or hallway floor elevation. Kitchen, bathroom doorway should be installed at the stone is not afraid of the water, the roots should be done in water treatment, to prevent water seepage from the doorway of the living room to. 5, bathroom, kitchen aisle spacing threshold special needs attention. Before installing the threshold, are required to be filled with cement mixing roofing maintenance agreement, to be dried and then placed the threshold of the door, so you can clean the toilet every day, the kitchen and the interval water effectively blocked effectively reach a waterproof , leak-proof effect. Waterproof toilet maintenance, repair leaking Shu houses, Castle Lake water service provided by the Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility