Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Crack leaking roof treatment, how to deal with Shu roof leaks, roof leaks Anyi |
Published: | 2015-03-16 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnel roof leaks treatment options, culverts, mine leaks, each kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so. How to prevent sub-lattice seam sealing cracks, shedding a scientific and rational selection of sealing materials, synthetic polymer suitable choice of elastic sealing material (elongation ≥200%), should not be used or modified bitumen asphalt sealing material category. 2, the construction of the sub-lattice seam sides were cleaned to remove dust, sand and mud, garbage and oil, etc., and construction of the base to keep it clean and dry. 3, at the construction site of brushing the corresponding base surface treatment agent, in order to protect the best sealant adhesion performance. 4, in the sub-grid cracks filled, backing material, can be used polyethylene foam backing rods or other materials. 5, filling them with sealant thickness should be filled, according to the thickness and width ratio of about 1/3 ~ 1/2's, such as when dividing joint width of 20mm, its filling them with thickness of the sealing material is appropriate for 7 ~ 10mm . 6, the quality of filling them is tight, continuous, firmly bonded, not bubbling, not collapsed, no cracks and other defects. 7, after the construction of attention in a timely manner to protect, before sealing material is cured from damage, flood damage, high temperatures and other effects. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, roof tunnel seepage treatment options, culverts roof leaks, leaking mine a variety of roof water trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so. Note that a waterproof bathroom renovation, ceiling: Because the bathroom in the course of the water vapor is more serious, in the purchase of the bathroom ceiling fitting time to select those materials with a waterproof, corrosion, rust-proof function. Second, the ground: Before floor tile, sure to make water; after laying tile, to ensure that there is a drain tile slope, slope towards the floor drain. After laying a good bathroom tile closed water experiments must be done to ensure that at least 24 hours. Be careful when laying tiles and wall tiles through the seam, to ensure the overall comfort of the entire bathroom. Third, the wall: wall tile roof leak proof and waterproof to do well how to do, to ensure smooth tiling, and to the floor tiles through the seam, aligned to ensure the overall sense of the wall and the ground. If you encounter outlet pipes, tile cuts should be cut properly, the overall look more perfect. Fourth, the doors and windows (windows renovation renderings): The best bathroom with windows to facilitate ventilation; toilet water to prevent spills, slightly higher than the inside of the bathroom door industry. Doors and ground clearance to leave the bathroom was slightly larger, which will help return air. If you are sliding doors, sliding doors between the recommendations and bathroom on the ground floor tile made waterproof. Fifth, laying circuit: Bathroom wire joints must hang tin, and has a waterproof tape and wrap insulation tape to ensure safety; wire body must put flame tube; all switches and sockets must be moisture-proof box. Crack leaking roof treatment, how to deal with Shu roof leaks, roof leaks provided by Anyi Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility