Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Seepage professional roofing construction, roofing seepage Anyi, Shu roofing projects
Information Name: | Seepage professional roofing construction, roofing seepage Anyi, Shu roofing projects |
Published: | 2015-03-15 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, roof water seepage tunnel construction professionals, culverts, mine leaks, each kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant engineering roofing seepage water trap treatment, membrane roofing projects and so on. Note that a waterproof bathroom renovation, ceiling: Because the bathroom in the course of the water vapor is more serious, in the purchase of the bathroom ceiling fitting time to select those materials with a waterproof, corrosion, rust-proof function. Second, the ground: Before floor tile, sure to make water; after laying tile, to ensure that there is a drain tile slope, slope towards the floor drain. After laying a good bathroom tile closed water experiments must be done to ensure that at least 24 hours. Be careful when laying tiles and wall tiles through the seam, to ensure the overall comfort of the entire bathroom. Third, the wall: wall tiles waterproof moisture to do well, to ensure smooth tiling, and to the floor tiles through the seam, aligned to ensure the overall sense of the wall and the ground. If you encounter outlet pipes, tile cuts should be cut properly, the overall look more perfect. Fourth, the doors and windows (windows renovation renderings): bathroom with windows roofing seepage Which is the best professional to facilitate ventilation; toilet water to prevent spills, slightly higher than the inside of the bathroom door industry. Doors and ground clearance to leave the bathroom was slightly larger, which will help return air. If you are sliding doors, sliding doors between the recommendations and bathroom on the ground floor tile made waterproof. Fifth, laying circuit: Bathroom wire joints must hang tin, and has a waterproof tape and wrap insulation tape to ensure safety; wire body must put flame tube; all switches and sockets must be moisture-proof box. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Kitchen wall waterproofing treatment to make the kitchen to achieve better water effects, coping kitchen floors and walls were made waterproof. Kitchen wall waterproofing should reach 0.3 meters height. Base surface treatment: 1. base surface must be strong, smooth, clean and free of dust, grease, wax, mold release agents and other substances, and other debris; 2. The base has pores, cracks, inequality defects shall advance with cement repair mortar smooth; 3. Ensure sufficient base surface moist, but no clear water. Details of the deal: 1. Mixing: first liquid material into the container, then slowly add the powder, and stir for 3-5 minutes until a homogeneous slurry and no raw dough particles can be used; (best Using a blender); 2. Brushing: Brushing with a brush or brush directly at the base surface, the intensity of the use of uniform roofing seepage, leakage can not brush; normally takes brushing 2 times (according to the use requirements), each Brushing thickness not exceeding 1mm; slightly dry after previous solid once again brushing (just sticky, generally spaced 1-2 hours), front and rear vertical cross brushing, brushing the total thickness is 1-2mm; If the coating has been cured, another first with water when brushing wet; 3. Conservation: 24 hours after construction proposal cover with a damp cloth or spray coating the coating watering conservation. 4. Protection: Take after construction ban completely dried before the stampede, rain, exposure, acute injury protection. Seepage professional roofing construction, roofing seepage Anyi, roofing projects Shu Shu provided by Nanchang waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) strong, credible, in Nanchang, Jiangxi construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu waterproof and you hand into the brilliant, for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility