Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657
| No.13637657
- Product Categories
- Friendly Links
- home > Supply > Roof waterproofing | Shu waterproof housing construction (certified) | Jinxian waterproof
| Information Name: | Roof waterproofing | Shu waterproof housing construction (certified) | Jinxian waterproof |
| Published: | 2015-03-10 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking deck waterproofing subway construction, garages, tunnels, culverts, mine leaks, each kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so. Methods of operation and precautions tunnel plugging tunnel waterproofing solutions include waterproofing and drainage measures of tunnel lining; drain blind construction; water board water treatment facilities construction joint programs, tunnel waterproofing is an important part of the tunnel project construction quality but also the operating process complicated, difficult part of the construction of water has always been valued by the people. Therefore, the price of waterproof construction, waterproof construction projects of the tunnel should be taken "with row-based, anti, row, cut, blocking the combination of" a comprehensive governance principles should be considered in accordance with this program and the local hydrogeological conditions adapted to local conditions. Achieve smooth drainage, water, reliable, economical and reasonable construction scheme. 1. waterproof layer laid on the water board outside the cave spacious, level area under the crop material, dual automatic welding machine welds welded into pieces, car transported to the cave through the water board work bench, using no nail holes laying process laying. Waterproof layer before laying the first removal of the exposed bolt heads initial support surface and wrap it with mortar, mortar for smoothing uneven place after work bench by the water board in turn fixed to both sides of non-woven fabrics from the arch, waterproof board. Through the construction of the first non-woven PVC gaskets fixed with concrete nails, and then using the hot air welding PVC waterproof board welding firm and PVC gaskets. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Kitchen wall waterproofing treatment to make the kitchen to achieve better water effects, coping kitchen floors and walls were made waterproof. Kitchen wall waterproofing should reach 0.3 meters height. Base surface treatment: 1. base surface must be strong, smooth, clean and free of dust, grease, wax, mold release agents and other substances, and other debris; 2. The base has pores, cracks, inequality defects shall advance with cement repair mortar smooth; 3. Ensure sufficient base surface moist, but no clear water. Details of the deal: 1. Mixing: first liquid material into the container, then slowly add the powder waterproof construction programs, while stir 3-5 minutes to form a homogeneous slurry and no raw dough particles can be used; (best to use the blender); 2. Brushing: Brushing with a brush or brush directly at the base surface, the intensity of the use of uniform, can not leak brush; normally takes brushing 2 times (according to the use requirements), each Brushing times thicker than 1mm; after brushing once before after a slightly dry solids were (just sticky, usually spaced 1-2 hours), front and rear vertical cross brushing, brushing the total thickness is 1-2mm ; If the coating has been cured, another first with water when brushing wet; 3. Conservation: 24 hours after construction proposal cover with a damp cloth or spray coating the coating watering conservation. 4. Protection: Take after construction ban completely dried before the stampede, rain, exposure, acute injury protection. Roof waterproofing | Shu waterproof housing construction (certified) | Jinxian Nanchang water provided by Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

