Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Elevator shaft plugging waterproof plugging _ _ Shu high security waterproof plugging Quote
Information Name: | Elevator shaft plugging waterproof plugging _ _ Shu high security waterproof plugging Quote |
Published: | 2015-03-09 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, waterproof plugging elevator shaft Waterproof plugging, plugging basement waterproofing, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. How to prevent sub-lattice seam sealing cracks, shedding a scientific and rational selection of sealing materials, synthetic polymer suitable choice of elastic sealing material (elongation ≥200%), should not be used or modified bitumen asphalt sealing material category. 2, the construction of the sub-lattice seam sides plugging cleaned to remove dust, sand and mud, garbage and oil, etc., and construction of the base to keep it clean and dry. 3, at the construction site of brushing the corresponding base surface treatment agent, in order to protect the best sealant adhesion performance. 4, in the sub-grid cracks filled, backing material, can be used polyethylene foam backing rods or other materials. 5, filling them with sealant thickness should be filled, according to the thickness and width ratio of about 1/3 ~ 1/2 of the roof waterproof plugging, such as when dividing joint width of 20mm, the thickness of its filling them with sealant 7 ~ 10mm is appropriate. 6, the quality of filling them is tight, continuous, firmly bonded, not bubbling, not collapsed, no cracks and other defects. 7, after the construction of attention in a timely manner to protect, before sealing material is cured from damage, flood damage, high temperatures and other effects. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Misunderstanding: developers do waterproof layer acceptance, no need to do when home improvement waterproof. But the decoration, taking into account factors such as lifestyle property owners will increase sanitary facilities and a variety of down pipes / lines relocation or move, it will seriously undermine the original waterproof layer, if not waterproof, the inevitable leaks occur. Strategy: Try to protect the original waterproof layer is not destroyed, it shall be removed original waterproof layer, and then redo waterproof. Myth: When fitting, waterproof on the line as long as done. However, indoor bathroom, kitchen base surface humidity, piping and more affected by hot and cold water pipes and detergents erosion, high water repellent properties of the target, if not carefully used inferior materials waterproof plugging construction, will a direct result of leakage. Strategy: Choose regular manufacturers of superior quality, good brand reputation waterproof. Myth: As long as the pipes, floor drain holes around the well water on the line. However, bathing, etc. will penetrate into the ground water tiles and tile seam, leakage occurs. Strategy: To fully waterproof construction site: pipes, drain holes and other peripherals, sanitary ware and other peripheral equipment, the bathroom floor, walls (return of not less than 1.8 meters high), kitchen and balcony floors, walls (back to high not less than 0.3 m) should be waterproof. Elevator shaft plugging waterproof plugging _ _ Shu high security waterproof plugging quotations provided by Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) strong, credible, in Nanchang, Jiangxi construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu waterproof and you hand into the brilliant, for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility