Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Housing waterproof plugging, Chang Dong water trap, Shu repair construction |
Published: | 2015-02-26 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. On the basement plugging a reason for the failure of the plugging material and waterproof material properties is not clear, it is not enough for water technology research, for many of the country's waterproof plugging materials are insufficient. 2, during the plugging of the time, do not determine the leakage point and for leaking lines. 3, see the seam leaks will conduct drilling grouting, did not consider is reasonable. 4, simply make use of some of the paint layer and coated the surface of the concrete mortar, for those hidden leakage point directly chose to ignore, only point-blocking, blocking and line blocking surface, so as to ensure the success of plugging. 5, for those who focus on settlement joint leakage or walls should adopt multi-channel water lines. The reason for the failure basement plugging basically several of our more than the introduction, so plugging work during the time, we must ensure that these errors do not produce, so as to better plugging work to ensure that its Success of. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage metro water trap, tunnels, culverts, mine leaks, various roof water trap works, leaking toilet water trap, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Key issues and operational considerations of a waterproof construction, the underlying disposition. Finishing leak site, find leaks and leaks to the site, the site with the symbol drawn gushing water seepage sites and bleeding sites. Press leaks and construction site conditions to determine the extent of repairs should extend the scope of water. 2, grouting. In the more significant cracks, leakage points, gushing parts of high-pressure grouting, imported high-pressure injection pump (≥400kg / cm2 pressure pump) for leaks at joints and filling topped gushing water trap until no leakage Fill stop, try to make the grouting material through the cracks. 3, plugging. Large cracks after grouting, small cracks due to pressure increases the performance of bleeding continued. Selection of waterproof cement interface agent plugging powder mixing quick-setting plaster 5mm thick, add water leakage grim parts to proper thickness. Scratch waterproof plugging inorganic materials chosen over the base surface is no longer bleeding. 4, waterproof. Brushing 3 cloth coated flexible waterproof layer 5, the first water trap again brushing waterproof coating prices, shop polyester nonwovens, then brushing waterproof coating, holes and non-woven fabrics, coated sequentially reach 3 cloth 5, constitute flexible waterproof layers. Water mixing with cement interface agent plugging powder quick-setting, cooperation ratio of 1: 1, roller or scratch two times, constitute a rigid waterproof layer maintenance. That is, to maintain flexible waterproof layer to maintain them, but also to make the next one posted outstanding operating base. 5. Maintenance layer of cement mortar. After thoroughly cured waterproof layer on the ground, doing maintenance 20mm thick layer of cement mortar, waterproof vertical walls do not need to maintain cement mortar layer, can directly do the decoration layer. Housing waterproof plugging, Chang Dong water trap, renovation Shu Shu waterproof construction provided by the Nanchang Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) strong, credible, in Nanchang, Jiangxi construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu waterproof and you hand into the brilliant, for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility