Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Housing waterproof plugging, Shu housing repair and construction, Castle Lake water trap
Information Name: | Housing waterproof plugging, Shu housing repair and construction, Castle Lake water trap |
Published: | 2015-02-26 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging plugging waterproof housing, steel tile has a wealth of experience in construction waterproofing preservative water trap, ground water engineering, plant water trap works, roll roofing projects and so on. Key issues and operational considerations of a waterproof construction, the underlying disposition. Finishing leak site, find leaks and leaks to the site, the site with the symbol drawn gushing water seepage sites and bleeding sites. Press leaks and construction site conditions to determine the extent of repairs should extend the scope of water. 2, grouting. In the more significant cracks, leakage points, gushing water trap parts of the high-pressure grouting price, selection of imported high-pressure injection pump (≥400kg / cm2 pressure pump) for leaks at the grout joints and gushing water until no leakage Note full stop, try to make the grouting material through the cracks. 3, plugging. Large cracks after grouting, small cracks due to pressure increases the performance of bleeding continued. Selection of waterproof cement interface agent plugging powder mixing quick-setting plaster 5mm thick, add water leakage grim parts to proper thickness. Scratch waterproof plugging inorganic materials chosen over the base surface is no longer bleeding. 4, waterproof. Brushing 3 cloth coated flexible waterproof layer 5, the first waterproof paint brush again, polyester non-woven fabric shop, then brushing waterproof coating, holes and non-woven fabrics, coated sequentially reach 3 cloth 5, constitute a flexible waterproof layer. Water mixing with cement interface agent plugging powder quick-setting, cooperation ratio of 1: 1, roller or scratch two times, constitute a rigid waterproof layer maintenance. That is, to maintain flexible waterproof layer to maintain them, but also to make the next one posted outstanding operating base. 5. Maintenance layer of cement mortar. After thoroughly cured waterproof layer on the ground, doing maintenance 20mm thick layer of cement mortar, waterproof vertical walls do not need to maintain cement mortar layer, can directly do the decoration layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, topped leaking toilet water trap, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile waterproof anti-corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. What corrosion plugging acceptance criteria 1, waterproof plugging construction method can effectively solve the seams underground concrete structure engineering, construction joints and Deformation, Honeycomb concrete shrinkage cracks and water leaks, sealing, water trap effect significant. 2, waterproof plugging construction technology construction method is simple and effective, compact equipment, repair leaking water from the construction site size limit. 3, waterproof plugging waterproof construction engineering methods currently used for grouting materials, caulking materials, have reached the advanced level, and some have reached the international level. 4, waterproof plugging construction methods, the use of special techniques, materials reinforced concrete cracks, especially for large-area small cracks pouring of concrete shrinkage produced seepage treatment can be carried out. Housing waterproof plugging, Shu housing repair and construction, Castle Lake water trap Limited provided by Nanchang Shu waterproofing. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility