Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | How water trap, Shu waterproof plugging Engineering Company, Lake District trap |
Published: | 2015-02-24 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. Key issues and operational considerations of a waterproof construction, the underlying disposition. Finishing leak site, find leaks and leaks to the site, the site with the symbol drawn gushing water seepage sites and bleeding sites. Press leaks and construction site conditions to determine the extent of repairs should extend the scope of water. 2, grouting. In the more significant cracks, leakage points, gushing parts of high-pressure grouting, imported high-pressure injection pump (≥400kg / cm2 pressure pump) for leaks at the grout joints and gushing water until no leak filled stopped, Try to make the grouting material through the cracks. 3, plugging. Large cracks after grouting, small cracks due to pressure increases the performance of bleeding continued. Selection of waterproof cement interface agent plugging powder mixing quick-setting plaster 5mm thick, add water leakage grim parts to proper thickness. Scratch waterproof plugging inorganic materials chosen over the base surface is no longer bleeding. 4, waterproof. Brushing 3 cloth coated flexible waterproof layer 5, the first waterproof paint brush again, polyester non-woven fabric shop, then brushing waterproof coating, holes and non-woven fabrics, coated sequentially reach 3 cloth 5, constitute a flexible waterproof layer. Water mixing with cement interface agent plugging powder quick-setting, cooperation ratio of 1: 1, roller or scratch two times, constitute a rigid waterproof layer maintenance. That is, to maintain flexible waterproof layer to maintain them, but also to make the next one posted outstanding operating base. 5. Maintenance layer of cement mortar. After thoroughly cured waterproof layer on the ground, doing maintenance 20mm thick layer of cement mortar, waterproof vertical walls do not need to maintain cement mortar layer, can directly do the decoration layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking, subway trap, garages, tunnels, culverts, mine leaks, all kinds of roofing trap works, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so. To place a waterproof summer renovation, construction of surface disposal: the demand for construction surface solid, clean. Construction of the irregular surface height, cracking for proper repair. Disposal site should be at right angles to the arc. Two-component waterproof material, JS waterproof materials under humid environment can still be an excellent film, and one-component waterproof material needs of the construction environment boring. 2, on the home improvement waterproof proposition: the construction of the entire project or home decor, the small amount of water disposal project occupied building water trap, but serious contact. Saying: "waterproof construction defeat is useless to build." After the completion of the entire construction of water works or put into use, if the onset of leakage doubt, will give the family, neighborhood and other aspects of the formation of a great loss and a lot of headaches. Dig the wall, smashing, go to war, it lost more than the beginning of the investment. So, especially proposition: the use of reliable products, to find a professional waterproof construction personnel and appropriate progress waterproofing investment. 3, waterproof coating: the construction of water trap construction program, from beginning to leak, drain pipes, etc., in the opposite direction of the flow of the adoption of the withdrawal method of construction. Health Tip vast network owners decoration, during road construction to every water trap, it is necessary to all disposable film construction were not leak Tu. Floor drain, drain, pipe leakage and other simple parts, the best look after blocking by plugging Ling, waterproof material should be many times brushing points. A waterproof layer construction can be carried out before the road waterproof layer is formed after the next. Each channel waterproof layer should be thin is not easy to thick, waterproof layer thickness between 1-3mm selection, on the usual moisture barrier (not rendered out of water) disposal, one to two times a waterproof coating can be. How water trap, Shu waterproof plugging Engineering Company, Lake District trap provided by Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility