Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
Information Name: | Toilet water how to do | Shu toilet water cost | Nanchang toilet water |
Published: | 2015-01-30 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of projects a professional water trap, waterproofing, repair water and other hotel toilet water, such as: large cracks leaking underground garage toilet water, tunnels, culverts, mine leaks, all kinds of roofing trap works, new homes leaking toilet toilet water, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects so. general practice is waterproof: closed water enclosed in the original experiment with cement mortar surface, to be dry (not damp finger), a combination of double polyurethane waterproof coating evenly into the brush three times, or made with modified bitumen or glass cloth two oil deal with a cloth. Requirements bathroom wall do 1.2-1.5m high, not less than 0.5m tall kitchen, balcony with exterior wall sill height prevail. After drying off water storage to do 24 hours a closed experiment, confirming that no leakage after ground construction. If the floor or wall of the original room was destroyed, it must be waterproof and sealed closed water experiments. Two traditional methods for editing building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer has a hard exterior tiles, according to the traditional method is to pry out the tile, then dug waterproof layer, re-do the new waterproof layer, re-tiled. Where labor costs, material costs, the time spent on consumption is very large. 3 ways to edit the latest water trap, where the traditional concept is leak up where. The latest water trap is to abandon the traditional idea, waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tiles do a waterproof, waterproof effect is the same. Water trap construction methods: a knife to remove the waterproof cement or glue between tile and tile, with a dryer drying the ground one day, and then the cement floor of the same color to fill the gully (ground is white, it filled with white cement floor is black, with black cement to fill in, so the room is done to Micron.) and use a special water repellent qualities CPC slowly inject cement inside, over a 1-2 day, water repellent and Cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, waterproof anti-corrosion steel tile, ground water engineering, plant water trap works, roll roofing projects and so has a wealth of experience in construction. Huan water trap Handbook "water trap construction program before the water trap construction, the construction unit in accordance with the design requirements toilet water how to do, it should be drawn and written construction plan drawings. Construction program including general outline, project quality objectives, organization and management and operation waterproof construction, waterproof material provides clear quality standards, construction procedures, work management and quality measures, since the waterproof structure and waterproof layer construction preparation, operation points already Some steps for hair and so on. Features water trap program: 1. The water trap preparation programs should reflect the combination of waterproof construction engineering quality acceptance and the specific design of the project. 2. To water trap to international standards, industry standards, corporate standards for construction basis, reflecting the water trap program designed complex theoretical basis. 3. To implement the water trap the whole process of construction, from construction tasks to regulatory requirements; summary from engineering to security measures; only waterproof material to the construction process, there must be clearly defined, supervision, inspection, to ensure project quality water trap For complete requirements on. The water trap program knows waterproof construction technical documents trap, so to clear division of responsibility to the person in charge, the foreman, the job monitor, operating workers who require clear responsibilities. The main contents of toilet water water trap prepared how to do | Shu toilet water cost | toilet water provided by Nanchang Nanchang Shu waterproof Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) is a leader in Nanchang, Jiangxi, construction, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In Shu waterproof leadership with the staff warmly welcome all inquiries negotiations to create a better future Shu waterproof. |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility