Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637657

- Product Categories
- Friendly Links
- home > Supply > Nanchang building waterproofing company | Nanchang waterproof | Shu plugging company charges
Information Name: | Nanchang building waterproofing company | Nanchang waterproof | Shu plugging company charges |
Published: | 2015-01-20 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap Nanchang waterproof construction engineering company, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects are all waterproof general practice are: closed in the original ground surface water sealed with cement mortar experiment, to be dry (not damp finger), in combination with a double into the polyurethane waterproof coating evenly brush three times or asphalt or fiberglass cloth made of two oil-cloth deal with. Requirements bathroom wall do 1.2-1.5m high roof waterproofing quote, not less than 0.5m high waterproof kitchen, balcony with exterior wall sill height prevail. After drying off water storage to do 24 hours a closed experiment, confirming that no leakage after ground construction. If the floor or wall of the original room was destroyed, it must be waterproof and sealed closed water experiments. Two traditional methods for editing building body leaks, it shows that deal with the problem is waterproof layer, waterproof layer has a hard exterior tiles, according to the traditional method is to pry out the tile, then dug waterproof layer, re-do the new waterproof layer, re-tiled. Where labor costs, material costs, the time spent on consumption is very large. 3 ways to edit the latest water trap, where the traditional concept is leak up where. The latest water trap is to abandon the traditional idea, waterproof layer leak, water leak on the well outside the tile work, as long as the outside surface of the tiles do a waterproof, waterproof effect is the same. Water trap construction methods: a knife to remove the waterproof cement or glue between tile and tile, with a dryer drying the ground one day, and then the cement floor of the same color to fill the gully (ground is white, it filled with white cement floor is black, with black cement to fill in, so the room is done to Micron.) and use a special water repellent qualities CPC slowly inject cement inside, over a 1-2 day, water repellent and Cement will be firmly adsorbed on the tile, effectively became a solid line of waterproof layer. Nanchang Shu waterproof Engineering Limited is an independent legal entity to undertake a large number of professional water trap, waterproofing, repair water and other projects, such as: large cracks leaking underground garage, tunnels, culverts, mine leaks, all kinds of roofing trap engineering, toilet leaks, water sealing, basement waterproofing plugging, has a wealth of experience in construction steel tile water corrosion, ground water engineering, plant water trap works, roll roofing projects and so on. crack repair detection patched completed crack, with core drilling machine testing. Test results should be concrete surface is smooth, dense, filled with a slurry of all the cracks, and core samples of concrete compressive strength test specification basement waterproofing, to repair the original design value ⒋ smear smear rugged construction and repair cracks at the process as follows: ) Thoroughly clean and moist surface to be repaired, remove any loose material and excess water. 2) coated with a sticky paste layer ratio in the repair area as the base material coated. 3) Mixing ratio of the applicator patch layer material, until the desired consistency. Such as the mix is ??too dry, add the wet premix; if the mixture is too thin, then the provisions of the ratio of dry material is added, the full mixing evenly. 4) with a rubber scraper bar ruler for cracks and uneven surfaces with the application of the patch smear than expected. Must be able to flow into the mix patching cracks or weathering area, to find and fill all voids. 5) coated with a sticky paste layer coated repair area ratio of the final material, so that the surface leveling, smooth. 6) Carefully place the protection has been patched to avoid walking, and so on until the water is too dry. Nanchang building waterproofing company | Nanchang waterproof | plugging Shu Shu water charges by Nanchang Engineering Limited. Nanchang Shu waterproof Engineering Limited (www.ncsrfs.com) strong, credible, in Nanchang, Jiangxi construction industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead Shu waterproof and you hand into the brilliant, for a better future! |
Admin>>>
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21350 visitor
Copyright © GuangDong ICP No. 10089450, Nanchang Shu waterproof Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility